TS002040083 — Cannot change schedules within level 4 subfolders
Fixed: Resolved an issue where schedules within level 4 subfolders could not be edited.
Reproduction Steps
1. Log in to the admin client.
2. From Scheduler, create a folder and add subfolders until there are 4 levels of subfolders.
3. Add a schedule to the 4th level subfolder.
4. Edit the schedule from step 3.
The result is the schedule cannot be edited with an error stating, "Processes are only allowed a maximum depth of 5".